Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? the standard normal equation can be applied as follows: z = startfraction left parenthesis due date minus expected date of completion right parenthesis over sigma subscript p endfraction , where z is the number of standard deviations the due date or target date lies from the mean or expected date and sigma subscript p is the project standard deviation, which is the square root of the variance. for the due date of 17 months, value of z based on the given information = negative 2.000 (round your response to two decimal places). using the standard normal table , the probability that the project will be completed in 17 months = nothing (round your response to four decimal places).

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
25 ! the line of best fit is h = 5a + 86. predict the height at age 16.
Answers: 2
question
Mathematics, 21.06.2019 18:30
The base of a triangle is 8 1 3 meters and the height of the triangle is the fourth root of 16 meters meters. what is the area of the triangle?
Answers: 3
question
Mathematics, 21.06.2019 21:20
Rose bought a new hat when she was on vacation. the following formula describes the percent sales tax rose paid b=t-c/c
Answers: 3
question
Mathematics, 21.06.2019 21:30
Three friends went on a road trip from phoenix, az, to san diego, ca. mark drove 50 percent of the distance. jason drove 1/8 of the distance. andy drove the remainder of the distance. 1. andy thinks he drove 1/4 of the distance from phoenix, az, to san diego, ca. is andy correct? 2. the distance from phoenix, az, to san diego, ca, is 360 miles. how many miles did each person drive? 3. solve the problem. what is the answer in total?
Answers: 3
You know the right answer?
Using pert, adam munson was able to determine that the expected project completion time for the cons...
Questions
question
Biology, 02.07.2019 14:00
question
Mathematics, 02.07.2019 14:00
question
Mathematics, 02.07.2019 14:00
Questions on the website: 13722367