Aproject whose critical path has an estimated time of 120 days with a variance of 100 has a 20% chance that the project will be completed before which day (rounded to nearest day)? 98 112 120 124 220

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:50
If f(x) = 2x + 2 and g(x) = x? , what is (gºf)(2)?
Answers: 2
question
Mathematics, 21.06.2019 19:00
Acompany manufactures large valves, packed in boxes. a shipment consists of 1500 valves packed in 75 boxes. each box has the outer dimensions 1.2 x 0.8 x 1.6 m and the inner dimensions 1.19 x 0.79 x 1.59 m. the boxes are loaded on a vehicle (truck + trailer). the available capacity in the vehicle combination is 140 m3. each valve has a volume of 0.06 m3. - calculate the load factor on the box level (%). - calculate the load factor on the vehicle level (%). - calculate the overall load factor (%).
Answers: 1
question
Mathematics, 21.06.2019 20:10
The constitution gives congress the power to create federal courts lower than the supreme court higher than the supreme court equal to the supreme court, unaffected by the supreme court.
Answers: 1
question
Mathematics, 21.06.2019 21:30
Vanessa earns a base salary of $400.00 every week with an additional5% commission on everything she sells. vanessa sold $1650.00 worth of items last week.
Answers: 2
You know the right answer?
Aproject whose critical path has an estimated time of 120 days with a variance of 100 has a 20% chan...
Questions
question
English, 13.01.2020 03:31
question
Mathematics, 13.01.2020 03:31
question
Spanish, 13.01.2020 03:31
question
Mathematics, 13.01.2020 03:31
question
Mathematics, 13.01.2020 03:31
question
Chemistry, 13.01.2020 03:31
question
Mathematics, 13.01.2020 03:31
Questions on the website: 13722363