subject
Mathematics, 29.06.2019 18:00 heavendavis101

Abuilding contractor is to dig a foundation 50 feet long, 20 feet wide and 10 feet deep. the contractor pays $15 per load for trucks to remove the dirt. each truckload holds 5 cubic yards of dirt. what is the cost to have all the dirt hauled away?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 20:30
Solve each quadratic equation by factoring and using the zero product property. 14x - 49 = x^2
Answers: 2
question
Mathematics, 21.06.2019 21:30
A.s.a.! similarity in right triangles, refer to the figure to complete this proportionc/a = a/? a.) cb.) hc.) rd.) s
Answers: 1
question
Mathematics, 21.06.2019 22:00
Solve 2 - 3 cos x = 5 + 3 cos x for 0° ≤ x ≤ 180° a. 150° b. 30° c. 60° d. 120°
Answers: 1
question
Mathematics, 21.06.2019 23:20
In the diagram below,abc is congruent to dec what is the value of x
Answers: 2
You know the right answer?
Abuilding contractor is to dig a foundation 50 feet long, 20 feet wide and 10 feet deep. the contrac...
Questions
question
Mathematics, 24.04.2020 04:16
question
Mathematics, 24.04.2020 04:17
question
Mathematics, 24.04.2020 04:17
question
Chemistry, 24.04.2020 04:17
question
Mathematics, 24.04.2020 04:17
question
Mathematics, 24.04.2020 04:17
Questions on the website: 13722367