It cost a contractor $13,750 to manufacture their first unit. the company expects to experience a 93% unit learning curve. estimate the cost of the 14th unit. (round intermediate calculations to 4 decimal places)

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 12:50
What is the value of  y  in the solution to the system of equations? x  +  y  =  12x  –  3y  =  –30a. –8b. –3c. 3d. 8
Answers: 1
question
Mathematics, 21.06.2019 18:00
John read the first 114 pages of a novel, which was 3 pages less than 1/3 of the novel. write an equation to determine the total number of pages (p)(p) in the novel.
Answers: 1
question
Mathematics, 21.06.2019 18:50
What are the values of a, b, and c in the quadratic equation 0 = x2 – 3x - 2? a = 1, b = 3, c = 2 a=, b = -3,c=-2 a = 1, b = 3, c= 2 a = 1.0= -3, c = 2
Answers: 2
question
Mathematics, 21.06.2019 20:30
Adecorative window is made up of a rectangle with semicircles at either end. the ratio of ad to ab is 3: 2 and ab is 30 inches. what is the ratio of the area of the rectangle to the combined area of the semicircles? possible answers: a. 2: 3 b. 3: 2 c. 6: π d. 9: π e. 30: π
Answers: 1
You know the right answer?
It cost a contractor $13,750 to manufacture their first unit. the company expects to experience a 93...
Questions
question
Mathematics, 02.12.2021 19:20
question
Computers and Technology, 02.12.2021 19:20
question
Computers and Technology, 02.12.2021 19:20
question
Mathematics, 02.12.2021 19:20
question
Mathematics, 02.12.2021 19:20
question
English, 02.12.2021 19:20
Questions on the website: 13722366