subject
Mathematics, 07.07.2019 15:00 BobJRJR

Amanufacturer of rubber balls estimates that 3 out of 500 balls produced are defective. the manufacturer produces 100,000 balls each week. predict the number of rubber balls that are not defective each week.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 20:00
For what type of equity loan are you lent a lump sum, which is to be paid within a certain period of time? a. a line of credit b. equity c. a second mortgage d. an amortization
Answers: 3
question
Mathematics, 21.06.2019 20:50
An automobile assembly line operation has a scheduled mean completion time, μ, of 12 minutes. the standard deviation of completion times is 1.6 minutes. it is claimed that, under new management, the mean completion time has decreased. to test this claim, a random sample of 33 completion times under new management was taken. the sample had a mean of 11.2 minutes. assume that the population is normally distributed. can we support, at the 0.05 level of significance, the claim that the mean completion time has decreased under new management? assume that the standard deviation of completion times has not changed.
Answers: 3
question
Mathematics, 22.06.2019 00:30
What line represents the relationship between r and s
Answers: 1
question
Mathematics, 22.06.2019 02:40
Jenny made a scale drawing of a city. the scale she used was 5 inches = 1 yard. what is the scale factor of the drawing?
Answers: 3
You know the right answer?
Amanufacturer of rubber balls estimates that 3 out of 500 balls produced are defective. the manufact...
Questions
question
Mathematics, 04.07.2019 05:40
question
Chemistry, 04.07.2019 05:40
Questions on the website: 13722362