subject
English, 14.07.2021 08:10 JNH16

Complete the sentences with words that are punctuated and spelled correctly. The "Big Dig" (the Central Artery/Tunnel Project) has been complex and challenging. Located in
Massachusetts, this tunnel is
eight lanes wide and more than three miles long. What is most amazing about this tunnel is that it is constructed under a major highway
and skyscrapers located in Boston's financial district.
Construction crews used "clamshell excavators" during this dig. These machines carved narrow
and then a special
substance was pumped into the trench to keep the dirt from caving in.
steel beams were lowered Into the trench and
concrete was pumped in.

ansver
Answers: 3

Another question on English

question
English, 21.06.2019 23:00
According to the study, a is when you string one quote after another in an essay without connecting them
Answers: 1
question
English, 22.06.2019 01:00
According to the first stasimon, the chorus appears certain that oedipus is the murder true false
Answers: 2
question
English, 22.06.2019 03:30
Read the excerpt. “this is a train-servicing station and we have to wait for a train.” he shakes his head. i smile. “it’d be nice if we could get one.” lauren mizock has revised her draft of “train tracks” to convey plot events using
Answers: 1
question
English, 22.06.2019 06:30
Someone get back to me , i really don’t get this
Answers: 2
You know the right answer?
Complete the sentences with words that are punctuated and spelled correctly. The "Big Dig" (the Cen...
Questions
question
History, 05.11.2020 01:00
question
History, 05.11.2020 01:00
question
Mathematics, 05.11.2020 01:00
question
English, 05.11.2020 01:00
question
Mathematics, 05.11.2020 01:00
Questions on the website: 13722363