subject
Engineering, 28.03.2022 22:50 angelak461

A homeowner has enough money to hire four workers for the construction of a second kitchen in his basement. he has already hired an electrician, a plumber, and a terrazzo worker. what other worker should he hire and why? a cabinetmaker, because cabinets will need to be built and installed

a general carpenter, because she can handle all of the other aspects of the project

a plasterer, because the kitchen will require drywall to be hung

a tile worker, because new flooring and a backsplash will need to be installed

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 18:10
Compute the pressure drop of 30°c air flowing with a mean velocity of 8 m/s in a circular sheet-metal duct 300 mm in diameter and 15 m long. use a friction factor, f 0.02, and pair = 1.1644 kg/m a. 37.26 pa b. 25.27 pa n c. 29.34 pa d. 30.52 pa
Answers: 1
question
Engineering, 04.07.2019 18:20
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
You know the right answer?
A homeowner has enough money to hire four workers for the construction of a second kitchen in his ba...
Questions
question
Biology, 16.03.2020 17:44
Questions on the website: 13722363