Engineering, 18.02.2022 07:30 thebrain1345

Why might construction crews want to install pipes before the foundation is poured? Plumbing crews are more expensive than concrete masons; therefore it is cheaper if they do their work first.
Plumbing crews are more expensive than concrete masons; therefore it is cheaper if they do their work first.

Pipes form an important component of the structural integrity of a foundation.
Pipes form an important component of the structural integrity of a foundation.

Plumbing must feed into municipal water and sewer lines buried below the foundation.
Plumbing must feed into municipal water and sewer lines buried below the foundation.

All utilities, including electrical and HVAC, are installed before the foundation is laid.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
question
Engineering, 03.07.2019 23:20
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
question
Engineering, 04.07.2019 18:10
Steel is coated with a thin layer of ceramic to protect against corrosion. what do you expect to happen to the coating when the temperature of the steel is increased significantly? explain.
Answers: 1
question
Engineering, 04.07.2019 18:10
Water at 55c flows across a flat plate whose surface temperature is held constant at 95c. if the temperature gradient at the plate's surface for a given value of x is 18 c/mm, find a) local heat transfer coefficient. b) heat flux
Answers: 3
You know the right answer?
Why might construction crews want to install pipes before the foundation is poured? Plumbing crews...
Questions
question
Biology, 06.01.2021 01:00
question
Business, 06.01.2021 01:10
question
Mathematics, 06.01.2021 01:10
question
Mathematics, 06.01.2021 01:10
question
Mathematics, 06.01.2021 01:10
question
English, 06.01.2021 01:10
question
Mathematics, 06.01.2021 01:10
Questions on the website: 13722361