subject
Engineering, 08.02.2022 02:30 ogbobbythman6154

Part 2. Your task is to design (i. e., layout and size) supply ductwork for a portion of a medical office building. Using the drawing provided, which shows locations of supply diffusers, return grills, and the RTU (which serves as the AHU), show where the ductwork will be laid out, and indicate the size of circular duct for all portions of the ductwork. The supply diffusers are shown as red boxes and the RTU is labeled as such.
To determine CFM per diffuser, use the “1 square foot = 1 CFM” rule-of-thumb. (Hint: The ceiling tiles shown on the plan are each 2’ x 2’.)
Assume all ducts will be circular.
Assume friction loss of 0.1.
You may use a duct calculator from class, borrow one from my office (Owen 250), or use an online calculator. Please return them to me in class or at Owen 250 when you are finished.
Your submittal must be easy to read and professional in appearance, and the duct sizes must be reasonably accurate.

Here's some guidance on how to do Part 2 on duct sizing.
Duct sizing:
• Start with the supply ductwork. The supply diffusers are the red boxes on the drawing. Determine the cfm of air from each diffuser from the square footage of the room (1 sf = 1 cfm). Ceiling tiles are 2 ft x 2 ft on the "reflected ceiling plan" drawing provided.
• The duct supplying a diffuser must also carry that cfm. Use a duct calculator to find duct size...https://www. oceanhvac. com/ductulator/
• Use 0.1 / 100 ft for friction and keep other default values. Enter the cfm for that duct and click "Calculate" to find the round duct size.
• Work your way upstream towards the RTU, joining ductwork to other ductwork from other diffusers. When two ducts join, the combined duct must be recalculated using the combined cfm. Ductwork is larger farther upstream.
• Repeat the process for return ductwork, with one return grill per room (you must place the grill yourself).
• Try to find the most efficient path the get both supply and return ductwork back to the RTU!


Part 2.

Your task is to design (i.e., layout and size) supply ductwork for a portion of a medical

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 18:10
Steel is coated with a thin layer of ceramic to protect against corrosion. what do you expect to happen to the coating when the temperature of the steel is increased significantly? explain.
Answers: 1
question
Engineering, 04.07.2019 18:10
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
You know the right answer?
Part 2. Your task is to design (i. e., layout and size) supply ductwork for a portion of a medical...
Questions
Questions on the website: 13722363