A front end loader has an output of 200 BCY of earth per hour. It loads a fleet of 3 trucks (capacity of 18 LCY each). The trucks haul the earth to a fill where it is compacted with a shrinkage factor of 10%. Each truck has a total cycle time of 15 minutes, assuming no delays. The earth has a swell of 20%. The job requires 18,000 CCY. How many hours are required to excavate and haul the material to the fill

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
question
Engineering, 04.07.2019 18:20
Athin walled concentric tube exchanger is used to cool engine oil from 160°c to 60°c with water that is available at 25°c acting as a coolant. the oil and water flow rates are each at 2 kg/s, and the diameter of the inner tube is 0.5 m and the corresponding value of the overall heat transfer coefficient is 250 w/m2. oc. how long must the heat exchanger be to accomplish the desired cooling? cpwater=4.187 kj/kg-candcpengine el=2.035 kj/kg·°c, oil . 120]
Answers: 1
You know the right answer?
A front end loader has an output of 200 BCY of earth per hour. It loads a fleet of 3 trucks (capacit...
Questions
question
Mathematics, 18.10.2021 01:40
question
Mathematics, 18.10.2021 01:40
question
Biology, 18.10.2021 01:40
question
Mathematics, 18.10.2021 01:40
question
Mathematics, 18.10.2021 01:40
question
Mathematics, 18.10.2021 01:40
Questions on the website: 13722362