After receiving Notice to Proceed (assume a duration of zero), the Pipe Pro project engineers will begin processing submittals for the materials to the engineers. The submittals activity should take approximately 6 days, which will give adequate time for them to be returned from the engineering team. Right after the submittals are returned, the team will take a day to order material. For the bedding material, delivery will take 5 days. For the pipe, delivery will take 14 days. Also following NTP, mobilization can start and should take approximately 4 days. After mobilization is complete, excavation of the trench can begin and will take 5 days. Following excavation and bedding material delivery, the bedding material can be placed in the trench and this will take 3 days. Then the bedding material will be compacted and this will take 3 days. Once the trench is prepped with the bedding material, the pipe can begin being laid, after it has arrived on site. It will take approximately 9 days to complete the pipe laying activity. It will then take about 3 days for the trench to be backfilled. Next, the backfill material will be compacted and you should expect this to take 2 day. Site clean-up should take about 2 days. Lastly, the engineers will inspect the site. Anticipate the final inspections will take 2 days. Finally, the terminal activity will be demobilization and this will take at least 1 day. Based on the information regarding the activities’ relationships you must create a schedule for the construction of the storm water system. Use days as the duration unit for the schedule
a. Develop a list of necessary activities and their corresponding durations. Provide this list as an accompaniment for the provided table.
b. Create an Activity on the Node Network, based on the logical relationships of the activities. Include Start and Finish activities. Provide a diagram of this network with your memo.
c. For each activity, calculate the Early Start (ES), Late Start (LS), Early Finish (EF), and Late Finish (LF).

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:10
Give heat transfer applications for the following, (i) gas turbines (propulsion) ) gas turbines (power generation). (iii) steam turbines. (iv) combined heat and power (chp). (v) automotive engines
Answers: 1
question
Engineering, 04.07.2019 18:10
Items are similar to the free issue items, but their access is limited. (clo5) a)-bin stock items free issue b)-bin stock controlled issue c)-critical or insurance spares d)-rebuildable spares e)-consumables
Answers: 1
You know the right answer?
After receiving Notice to Proceed (assume a duration of zero), the Pipe Pro project engineers will b...
Questions
question
Mathematics, 01.12.2021 22:40
question
Mathematics, 01.12.2021 22:40
Questions on the website: 13722363