A storm sewer is to drain an area of 40 acres. Design the diameter of this storm sewer if it is to carry away rain falling at a rate of 2 inches per hour during a period of 30 minutes, the time needed for the entire drainage area to become tributary to the storm sewer. The required minimum velocity of flow is the cleaning velocity of the sewer, which is 3 feet per s

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
question
Engineering, 04.07.2019 18:10
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
question
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
question
Engineering, 04.07.2019 18:10
The flow rate of air through a through a pipe is 0.02 m5/s. a pitot static tube is placed in the flow. the radius of the pitot static tube is 1 mm. assuming the flow to be steady and the air to be at 300k, calculate the difference in total and static pressure if the diameter of the pipe is: (a) d 0.1 m d 0.05 m (c) d 0.01 m
Answers: 2
You know the right answer?
A storm sewer is to drain an area of 40 acres. Design the diameter of this storm sewer if it is to c...
Questions
question
Mathematics, 25.08.2019 08:30
question
Social Studies, 25.08.2019 08:30
question
Social Studies, 25.08.2019 08:30
Questions on the website: 13722367