5. A manufacturing company implemented a new production process to reduce defective fuses. From the old process, it was computed that at least 1 defect costs the company an average of
$6,500,000.00 per production run. After implementing the new process, suppose a large lot
contains 10% defective fuses and four fuses are randomly sampled from the lot.

a. Find the probability that at least one fuse in the sample of four is defective.

b. (Continuing from result in item a) in one production run of 500 eighty-unit lots, how
much would be the loss if the cost to manufacture one unit is 335.75?

c. How much is the difference from the old process? Did the new process effectively
reduce the company's losses?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 15:10
If you were designing a bumper for a car, would you prefer it to exhibit elastic or plastic deformation? why? consider the functions of a bumper in both a minor "fender-bender" and a major collision.
Answers: 1
question
Engineering, 04.07.2019 18:10
Fluids at rest possess no flow energy. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
Aflywheel accelerates for 5 seconds at 2 rad/s2 from a speed of 20 rpm. determine the total number of revolutions of the flywheel during the period of its acceleration. a.5.65 b.8.43 c. 723 d.6.86
Answers: 2
question
Engineering, 04.07.2019 18:10
Courses that are developed by subject matter experts, internal or extemal to the college or university. these programs are marketed by the school (clo2) marks a)-vocational schools b)-vendor training c)-colleges & universities d)-continuing education programs
Answers: 2
You know the right answer?
5. A manufacturing company implemented a new production process to reduce defective fuses. From th...
Questions
question
World Languages, 07.12.2020 21:00
question
English, 07.12.2020 21:00
Questions on the website: 13722363