When a time-delay period longer than the maximum preset time allowed for a single timer is required, the problem can be solved by programming two or more time together. A. True
B. False

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
question
Engineering, 04.07.2019 18:10
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
question
Engineering, 04.07.2019 18:20
Determine the damped natural frequencies and the steady state response of a decoupled damped forced two degrees of freedom system. 10รค1 + 2q1 20q1 10 cos t; 10q2 +4q2 + 40q2 10 cos t
Answers: 3
question
Engineering, 04.07.2019 19:10
What is creep? what is stress relaxation?
Answers: 1
You know the right answer?
When a time-delay period longer than the maximum preset time allowed for a single timer is required,...
Questions
question
Mathematics, 19.11.2020 03:50
question
History, 19.11.2020 03:50
question
Mathematics, 19.11.2020 03:50
question
History, 19.11.2020 03:50
question
Mathematics, 19.11.2020 03:50
question
Mathematics, 19.11.2020 03:50
Questions on the website: 13722363