subject
Engineering, 04.08.2021 22:50 samantaisabel6015

A treatment plant is being designed for a city that requires an equalization basin to even out flow. The average daily flow is 0.400 m3/s. At certain time the hourly flow rate was 0.526 m3/s. Find the volume (m3) of water added/removed in the equalization basin during that period.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 18:10
The flow rate of air through a through a pipe is 0.02 m5/s. a pitot static tube is placed in the flow. the radius of the pitot static tube is 1 mm. assuming the flow to be steady and the air to be at 300k, calculate the difference in total and static pressure if the diameter of the pipe is: (a) d 0.1 m d 0.05 m (c) d 0.01 m
Answers: 2
question
Engineering, 04.07.2019 18:20
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:20
Describe one experiment in which the glass transition temperature and melting temperature of a totally amorphous thermoplastic material can be determined. show the relevant experimental results in a diagram which should be properly annotated with the two temperatures clearly marked. what is likely to happen to the curve in the diagram if the amorphous polymer is replaced by a thermosetting type?
Answers: 2
You know the right answer?
A treatment plant is being designed for a city that requires an equalization basin to even out flow....
Questions
question
Mathematics, 13.02.2022 05:40
question
Mathematics, 13.02.2022 05:40
question
Mathematics, 13.02.2022 05:50
Questions on the website: 13722363