In a standard 6-day period, the production department programme a specific machine to work for 250 hours- its loading time. Changeovers and set-ups take average of 8 hours and breakdown failures average 3 hours every 6 days.
The time when the machine cannot work because it is waiting for material to be delivered from other parts of the process is 1 hour on average and during the period when the machine is running, it averages 92 per cent of its rated speed.
Two per cent of the parts processed by the machine are subsequently found to be defective in some way.

Based on above data, calculate overall equipment effectiveness (OEE)

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following refers to refers to how well the control system responds to sudden changes in the system. a)-transient regulation b)- distributed regulation c)-constant regulation d)-steady-state regulation
Answers: 1
question
Engineering, 04.07.2019 18:10
Ahot wire operates at a temperature of 200°c while the air temperature is 20°c. the hot wire element is a tungsten wire of 5 um diameter and 2 mm in length. plot using excel current, heat transfer and heat generated by the wire for air velocity varying from 1-10 m/s in steps of lm/s? matlab the sensor voltage output, resistance, or assume nu 0.989 re033pr13 take air properties at tr (200°c20°c)/2 = 110°c properties of tungsten: c 0.13 kj/kg.k 3 p 19250 kg/m k (thermal conductivity) = 174 w/m.k
Answers: 2
You know the right answer?
In a standard 6-day period, the production department programme a specific machine to work for 250 h...
Questions
Questions on the website: 13722359