subject
Engineering, 10.07.2021 18:40 pattydixon6

C. Assuming a fixed-priority scheduling. Consider two tasks to be executed periodically on a single processor, where task 1 has period p= 4 and task 2 has period p= 6. If execution time of task I be e;=1
Find the maximum value for the execution time e2 of task 2 such that the Rate Monotonic (RM) schedule is feasible. ​

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Amass of 1.5 kg of air at 120 kpa and 24°c is contained in a gas-tight, frictionless piston-cylinder device. the air is now compressed to a final pressure of 720 kpa. during the process, heat is transferred from the air such that the temperature inside the cylinder remains constant. calculate the boundary work input during this process.
Answers: 2
question
Engineering, 04.07.2019 18:10
Aplate clutch has a single pair of mating friction surfaces 250-mm od by 175-mm id. the mean value of the coefficient of friction is 0.30, and the actuating force is 4 kn. a) find the maximum pressure and the torque capacity using the uniform-wear model. b) find the maximum pressure and the torque capacity using the uniform-pressure model.
Answers: 3
question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
You know the right answer?
C. Assuming a fixed-priority scheduling. Consider two tasks to be executed periodically on a single...
Questions
question
Mathematics, 21.05.2021 19:10
question
Mathematics, 21.05.2021 19:10
question
Mathematics, 21.05.2021 19:10
question
Computers and Technology, 21.05.2021 19:10
question
Computers and Technology, 21.05.2021 19:10
Questions on the website: 13722363