Engineering, 28.06.2021 18:20 abenjamin489
A heat pump heats the air in a rigid, insulated cuboid room of size 25m x 10m x 4m. The heat pump consumes 15 kW of power. The initial temperature and pressure in this room are 12°C and 1 bar, respectively. With an average coefficient of performance of COPHP= 3.0 over the range of air temperature in this room.
Requried:
How long will it take to raise the temperature in the room to 27 °C?
Answers: 1
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
Engineering, 04.07.2019 18:10
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
Engineering, 04.07.2019 18:20
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
A heat pump heats the air in a rigid, insulated cuboid room of size 25m x 10m x 4m. The heat pump co...
Mathematics, 03.01.2021 17:20
Geography, 03.01.2021 17:20
Mathematics, 03.01.2021 17:20
Health, 03.01.2021 17:30
Geography, 03.01.2021 17:30
Physics, 03.01.2021 17:30
Chemistry, 03.01.2021 17:30
English, 03.01.2021 17:30
Mathematics, 03.01.2021 17:30
Chemistry, 03.01.2021 17:30
Biology, 03.01.2021 17:30
Computers and Technology, 03.01.2021 17:30
English, 03.01.2021 17:30