You are in charge of a large assembly shop. One of your customers has promised to award you a large contract for the assembly of 1000 units of a new product. The suggested bid price is based on an average of 20 hours of direct labor per unit. You conduct a couple test assemblies and find that, the first unit took 50 hours and the second unit completed in just 45 hours. How many hours do you expect the assembly of the first hundred units and the second 100 units to take? Is the contractor’s assumption about the average labor hours per unit valid or should the price be revised?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:20
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
question
Engineering, 04.07.2019 18:20
Determine the damped natural frequencies and the steady state response of a decoupled damped forced two degrees of freedom system. 10ä1 + 2q1 20q1 10 cos t; 10q2 +4q2 + 40q2 10 cos t
Answers: 3
question
Engineering, 04.07.2019 18:20
How much power could a wind turbine produce if it had the following specifications? cp = 0.45 -d=1.2kg/m3 d=50m v 5m/s
Answers: 2
You know the right answer?
You are in charge of a large assembly shop. One of your customers has promised to award you a large...
Questions
question
Mathematics, 10.02.2021 02:20
question
History, 10.02.2021 02:20
question
Mathematics, 10.02.2021 02:20
question
Mathematics, 10.02.2021 02:20
question
Mathematics, 10.02.2021 02:20
Questions on the website: 13722363