A concrete mixer can produce 50 m3 of concrete by employing 5 workers for 8 hours/day. Daily rate of one worker is 50 L. E/day. This daily production can be increased to 100 m3/day by employing 3 more workers at the same rate. - Calculate the labor productivity for both cases. - Decide whether to employ the additional workers or not

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
Aflywheel accelerates for 5 seconds at 2 rad/s2 from a speed of 20 rpm. determine the total number of revolutions of the flywheel during the period of its acceleration. a.5.65 b.8.43 c. 723 d.6.86
Answers: 2
question
Engineering, 04.07.2019 18:10
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
question
Engineering, 04.07.2019 18:20
The characteristic roots of a dynamic system are: 1.7920 1.8160 i, -1.7920 1.8160 i, -0.4160 what is the order of this system? what are the settling time and damping ratio of the system?
Answers: 3
You know the right answer?
A concrete mixer can produce 50 m3 of concrete by employing 5 workers for 8 hours/day. Daily rate of...
Questions
question
Chemistry, 09.10.2019 13:00
question
Mathematics, 09.10.2019 13:00
Questions on the website: 13722367