subject
Engineering, 14.06.2021 15:20 173899

It is a well-known principle that the engineer should not tell the contractor how to do the work; but, if the engineer observes that the contractor’s construction methods appear to be unable to meet the specifications. Required:
What should the engineer do?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:10
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
You know the right answer?
It is a well-known principle that the engineer should not tell the contractor how to do the work; bu...
Questions
question
Mathematics, 02.03.2020 20:20
Questions on the website: 13722363