Engineering, 17.05.2021 16:20 yoyo5752
The diameters of the suction and delivery pipes are 15 cm. The motor is supplied at 460 volt, 3 phase and has a power factor of 0.875 and has a constant efficiency of 90%. A) Calculate by hand the net head delivered and the efficiency of the pump at flow rate of 63 L/s. B) Use excel sheet and its formula to solve the equations and plot the pump head, power input, and efficiency versus the pump flow rate
![ansver](/tpl/images/cats/User.png)
Answers: 1
![](/tpl/images/ask_question.png)
![](/tpl/images/ask_question_mob.png)
Another question on Engineering
![question](/tpl/images/cats/User.png)
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
![question](/tpl/images/cats/User.png)
Engineering, 04.07.2019 18:10
Ajournal bearing has a journal diameter of 3.250 in with a unilateral tolerance of 20.003 in. the bushing bore has a diameter of 3.256 in and a unilateral tolerance of 0.004 in. the bushing is 2.8 in long and supports a 700-lbf load. the journal speed is 900 rev/min. find the minimum oil film thickness and the maximum film pressure for both sae 20 and sae 20w-30 lubricants, for the tightest assembly if the operating film temperature is 160°f. a computer code is appropriate for solving this problem.
Answers: 3
![question](/tpl/images/cats/User.png)
Engineering, 04.07.2019 18:20
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
![question](/tpl/images/cats/User.png)
Engineering, 04.07.2019 19:20
Determine the time of the day and month of the year at which the peak sensible cooling load occurs for a top floor, north-eastern corner room of an office building in durban for the following conditions: floor area: 8 x 8 x 3 m east and north walls: 115 mm face brick (outside), 20 mm air space, 115 mm ordinary brick (inside) with 15 mm plaster roof construction: suspended plasterboard ceiling, 450 mm air space, 150 mm concrete, 75mm screed, waterproofing no heat transfer across other surfaces window area 3x 1,5 m high in north wall only. ordinary glass with venetian blinds. lights and occupants : from 07: 00 to 18: 00 average light density: 25 w/m2 number of occupants : 5 seated, light office work room temperature 24°c
Answers: 3
You know the right answer?
The diameters of the suction and delivery pipes are 15 cm. The motor is supplied at 460 volt, 3 phas...
Questions
![question](/tpl/images/cats/himiya.png)
Chemistry, 06.05.2021 07:50
![question](/tpl/images/cats/mat.png)
![question](/tpl/images/cats/en.png)
![question](/tpl/images/cats/ap.png)
Advanced Placement (AP), 06.05.2021 07:50
![question](/tpl/images/cats/mkx.png)
Arts, 06.05.2021 07:50
![question](/tpl/images/cats/mat.png)
Mathematics, 06.05.2021 07:50
![question](/tpl/images/cats/istoriya.png)
![question](/tpl/images/cats/mat.png)
![question](/tpl/images/cats/mat.png)
Mathematics, 06.05.2021 07:50
![question](/tpl/images/cats/en.png)
![question](/tpl/images/cats/himiya.png)
![question](/tpl/images/cats/en.png)
![question](/tpl/images/cats/mat.png)
Mathematics, 06.05.2021 07:50
![question](/tpl/images/cats/mat.png)
![question](/tpl/images/cats/mat.png)
![question](/tpl/images/cats/mat.png)
Mathematics, 06.05.2021 07:50
![question](/tpl/images/cats/mat.png)
![question](/tpl/images/cats/mat.png)
Mathematics, 06.05.2021 08:00
![question](/tpl/images/cats/mat.png)
Mathematics, 06.05.2021 08:00
![question](/tpl/images/cats/mat.png)
Mathematics, 06.05.2021 08:00