subject
Engineering, 11.05.2021 20:30 allieballey0727

You are responsible for design and construction of a new freeway. Estimated flow rate for the freeway is each direction in design hour is 7500 vph. The deigned freeway should meet the following conditions: a) It should operate at level of service of B or higher during the design hour and A for the rest of the times. b) The base free flow speed for the freeway is 75 mph and free flow speed should not fall below 70 mph. c) Due to topography constraints, the widths of the cross section cannot exceed 200 ft. d) On average, number of access points to the freeway 2 per mile. What is your recommended design for this section of the freeway

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
question
Engineering, 04.07.2019 18:20
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
question
Engineering, 04.07.2019 18:20
Atank with constant volume contains 2.27 kg of a mixture of water phases (liquid-vapor). in the initial state the temperature and the quality are 127 °c and 0.6, respectively. the mixture is heated until the temperature of 160 oc is reached. illustrate the process in a t-v diagram. then, determine (1) the mass of the vapor in kg at the initial state, (2) the final pressure in kpa.
Answers: 3
You know the right answer?
You are responsible for design and construction of a new freeway. Estimated flow rate for the freewa...
Questions
question
History, 15.12.2019 18:31
question
Biology, 15.12.2019 18:31
Questions on the website: 13722363