The design of a concrete mix requires 1173 kg/m3 of gravel in dry condition, 582 kg/m3 of sand in dry condition, and 157 kg/m3 of free water. The gravel available at the site has a moisture content of 0.9% and absorption of 1.5%, and the available sand has a moisture content of 1.2 and absorption of 1.5%. What are the masses of gravel, sand, and water per cubic meter that should be used at the job site

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
Water at the rate of 1 kg/s is forced through a tube with a 2.5 cm inner diameter. the inlet water temperature is 15°c, and the outlet water temperature is 50°c. the tube wall temperature is 14°c higher than the local water temperature all along the length of the tube. what is the length of the tube?
Answers: 3
You know the right answer?
The design of a concrete mix requires 1173 kg/m3 of gravel in dry condition, 582 kg/m3 of sand in dr...
Questions
question
Mathematics, 08.08.2019 19:30
Questions on the website: 13722367