subject
Engineering, 03.05.2021 16:40 NateTheBeast12

Q2 [45 marks] Consider Ibra region where the installed solar panels cost on average 2 OMR /W. [10 marks] What is the cost to install a 5kW PV system for a residence?

[10 marks] If the solar irradiance in Ibra is on average 800W/m2 and the installed panels have efficiency of 18%. How many panels are required if the panel’s area is 2m2?

[15 marks] Assume Ibra has an average of 10 day-hours, dusty environment which causes the efficiency of the solar system to drop by 10% on average, and 30 cloudy days/year which cause the efficiency of the solar panels drops by 50%. If electrical power cost per kWh is 0.05 OMR determine the break-even time for the 5kW PV system.

[10 marks] If the system to be off-grid, what would be the backup time if three 12-V batteries were selected each with a capacity of 200Ah. Assume that you can discharge the batteries up to 80% of their capacities.​

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
question
Engineering, 04.07.2019 18:10
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
question
Engineering, 04.07.2019 18:10
Compute the pressure drop of 30°c air flowing with a mean velocity of 8 m/s in a circular sheet-metal duct 300 mm in diameter and 15 m long. use a friction factor, f 0.02, and pair = 1.1644 kg/m a. 37.26 pa b. 25.27 pa n c. 29.34 pa d. 30.52 pa
Answers: 1
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
You know the right answer?
Q2 [45 marks] Consider Ibra region where the installed solar panels cost on average 2 OMR /W. [10...
Questions
question
English, 25.02.2021 22:10
question
Mathematics, 25.02.2021 22:10
question
Chemistry, 25.02.2021 22:10
question
Mathematics, 25.02.2021 22:10
question
Health, 25.02.2021 22:10
question
Mathematics, 25.02.2021 22:10
question
Mathematics, 25.02.2021 22:10
Questions on the website: 13722367