Part X requires machining on a milling machine (operations A and B are required). Find the number of machines required to
produce 3000 parts per week. Assume the company will be
operating 5 days per week, 18 hours per day. The following
information is known:
Ext. If the milling machine requires tool changes and
preventive maintenance after every lot of 500 parts.
These changes require 30 min.


Part X requires machining on a milling machine (operations A

and B are required). Find the number

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
question
Engineering, 04.07.2019 18:10
Which of the following refers to refers to how well the control system responds to sudden changes in the system. a)-transient regulation b)- distributed regulation c)-constant regulation d)-steady-state regulation
Answers: 1
You know the right answer?
Part X requires machining on a milling machine (operations A and B are required). Find the number...
Questions
Questions on the website: 13722360