subject
Engineering, 19.04.2021 16:00 xojade

3. A pipeline is to be run from a water-treatment plant to a major suburban development 3 km away. The peak demand is 0.578 m3 /s. Determine the required diameter of ductile-iron pipe such that the flow velocity during peak demand is 2.5 m/s. Round the pipe diameter upward to the nearest 25 mm (i. e., 25 mm, 50 mm, 75 mm, . . .). The water pressure at the development is to be at least 140 kPa during peak demand. If the water at the treatment plant is stored in a ground-level reservoir where the level of the water is 10.00 m NGVD and the ground elevation at the suburban development is 8.80 m NGVD, determine the pump head that must be available to meet peak demands. (*NGVD

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
question
Engineering, 04.07.2019 18:20
An engine runs on the ideal diesel cycle. the cycle has a compression ratio of 20 and a cutoff ratio of 2. the highest temperature in the cycle is 1200 k. if the heat into the system is 300 kj/kg of working fluid and using variable specific heats determine the work produced per mass of working fluid
Answers: 3
question
Engineering, 06.07.2019 02:30
In a unit cell of fcc structure, indicate the position of one of the tetrahedral interstitial sites by plotting the corresponding tetrahedron. do the same for one of the octahedral interstitial sites (in a separate fcc unit cell). mark the positions of all the tetrahedral and octahedral interstitial sites in the unit cells. how many equivalent tetrahedral sites and how many equivalent octahedral sites are contained in a fcc unit cell, respectively. what is the coordination number for a tetrahedral site and what is the coordination number for an octahedral site?
Answers: 2
You know the right answer?
3. A pipeline is to be run from a water-treatment plant to a major suburban development 3 km away. T...
Questions
question
Chemistry, 02.12.2020 03:00
question
Mathematics, 02.12.2020 03:00
question
Physics, 02.12.2020 03:00
question
Mathematics, 02.12.2020 03:00
question
Mathematics, 02.12.2020 03:00
question
Chemistry, 02.12.2020 03:00
question
Chemistry, 02.12.2020 03:00
question
Mathematics, 02.12.2020 03:00
question
Mathematics, 02.12.2020 03:00
Questions on the website: 13722365