subject
Engineering, 15.04.2021 23:40 percent74

A municipal wastewater treatment plant employs two circular primary clarifiers arranged in parallel, following the bar screen and grit removal chamber. The plant receives 5.0 MGD. Each clarifier is center-fed (water enters at the center and exits at the perimeter). The clarifier radius is 43.0 ft, and depth is 10.0 ft. (a) What is the detention time in each clarifier

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:10
The flow rate of air through a through a pipe is 0.02 m5/s. a pitot static tube is placed in the flow. the radius of the pitot static tube is 1 mm. assuming the flow to be steady and the air to be at 300k, calculate the difference in total and static pressure if the diameter of the pipe is: (a) d 0.1 m d 0.05 m (c) d 0.01 m
Answers: 2
question
Engineering, 04.07.2019 18:10
Courses that are developed by subject matter experts, internal or extemal to the college or university. these programs are marketed by the school (clo2) marks a)-vocational schools b)-vendor training c)-colleges & universities d)-continuing education programs
Answers: 2
You know the right answer?
A municipal wastewater treatment plant employs two circular primary clarifiers arranged in parallel,...
Questions
question
Mathematics, 04.02.2020 00:11
question
Social Studies, 04.02.2020 00:11
question
Mathematics, 04.02.2020 00:11
Questions on the website: 13722361