subject
Engineering, 08.04.2021 16:10 michellebreshears451

The town of Pittsburgh discharges 0.126 m3/s of treated wastewater into Cherry Creek. The BOD5 of the wastewater is 34 mg/L. Cherry Creek has a 10-year, 7-day low flow of 0.126 m3/s. Upstream of the wastewater outfall from Pittsburgh, the BOD5 is 1.2 mg/L. The BOD rate constants k are 0.222 d21 and 0.090 d21 for the wastewater and creek respectively. The temperature of both the creek and the municipal wastewater is 208C. Calculate the initial ultimate BOD after mixing.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 19:30
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
question
Engineering, 04.07.2019 18:10
Water at 55c flows across a flat plate whose surface temperature is held constant at 95c. if the temperature gradient at the plate's surface for a given value of x is 18 c/mm, find a) local heat transfer coefficient. b) heat flux
Answers: 3
question
Engineering, 04.07.2019 18:10
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
question
Engineering, 04.07.2019 18:20
What is the heat treatment of metals? what is the benefit of it? why and how it's useful? answer in details, do not write by hand.
Answers: 3
You know the right answer?
The town of Pittsburgh discharges 0.126 m3/s of treated wastewater into Cherry Creek. The BOD5 of th...
Questions
question
Mathematics, 12.12.2020 16:40
question
Computers and Technology, 12.12.2020 16:40
question
Mathematics, 12.12.2020 16:40
question
Mathematics, 12.12.2020 16:40
question
History, 12.12.2020 16:40
Questions on the website: 13722363