subject
Engineering, 05.04.2021 17:50 kallie862

Q2. Figure 1 shows the floor plan of a proposed G+2 office building. It consist of one-way slabs spanning between beams on grid lines A, B, C and D. At this stage as a structural engineer you
should design end span of the slab with Leff = 6 m, considering the design loads for the floor
(excluding the self-weight) includes a superimposed dead load (SDL) of 1.5 kN/m² to account
for finishes, ceiling etc and live load 6+(W/10) (Last 2 digits of your id). In addition, a 0.8 kN/m
wall load is applied around the building perimeter and on the beams located internally. Consider
the ends of the slab to be simply supported. Design the flexural reinforcement in the middle of
the end span, check for shear and deflection for the slab according to BS 8110 code provisions.
Consider the overall depth of slab as 200 mm and 12 mm bars along both directions.

the last digits of the Id=71
​

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:20
Wiy doeres rere okhn a pump whon working betwon the same pressure range?
Answers: 2
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
Q2. Figure 1 shows the floor plan of a proposed G+2 office building. It consist of one-way slabs sp...
Questions
question
Mathematics, 18.09.2019 22:30
Questions on the website: 13722362