subject
Engineering, 03.04.2021 17:50 memester74

A wastewater treatment plant has a design average flow of 15,000 m^3 /d. The engineer wishes to use rectangular clarifiers for primary treatment. Design the rectangular tanks for a maximum overflow rate of 42 m 3 /m 2 · d and a minimum detention time of 2 h. Which criteria govern the design?


A wastewater treatment plant has a design average flow of 15,000 m^3 /d. The engineer wishes to use

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:10
At 12 noon, the count in a bacteria culture was 400; at 4: 00 pm the count was 1200 let p(t) denote the bacteria cou population growth law. find: (a) an expression for the bacteria count at any time t (b) the bacteria count at 10 am. (c) the time required for the bacteria count to reach 1800.
Answers: 1
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
A wastewater treatment plant has a design average flow of 15,000 m^3 /d. The engineer wishes to use...
Questions
question
Mathematics, 16.09.2020 06:01
question
Mathematics, 16.09.2020 06:01
question
Mathematics, 16.09.2020 06:01
question
Mathematics, 16.09.2020 06:01
question
English, 16.09.2020 06:01
question
English, 16.09.2020 06:01
question
Mathematics, 16.09.2020 06:01
question
Mathematics, 16.09.2020 06:01
question
Mathematics, 16.09.2020 06:01
question
Mathematics, 16.09.2020 06:01
question
Mathematics, 16.09.2020 06:01
question
Mathematics, 16.09.2020 06:01
question
Mathematics, 16.09.2020 06:01
question
Mathematics, 16.09.2020 06:01
question
Mathematics, 16.09.2020 06:01
question
Mathematics, 16.09.2020 06:01
question
Mathematics, 16.09.2020 06:01
question
Mathematics, 16.09.2020 06:01
question
Mathematics, 16.09.2020 06:01
question
Mathematics, 16.09.2020 06:01
Questions on the website: 13722367