4. Three conveyor belts are arranged to transport material and the conveyor belts must be started in reverse sequence (the last one first and the first one last) so that the material does not get piled on to a stopped or slow-moving conveyor. Each belt takes 45 seconds to reach full speed. Design a ladder logic that would control the start and stop of this three-conveyor system.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 03.07.2019 14:10
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
question
Engineering, 04.07.2019 08:10
Which of the following is an easy way to remember the modified “x” tire rotation? a. nondrive wheels straight, cross the drive wheels b. drive wheels straight, cross the nondrive wheels c. drive wheels crossed, nondrive wheels straight d. drive wheels crossed, nondrive wheels crossed
Answers: 1
You know the right answer?
4. Three conveyor belts are arranged to transport material and the conveyor belts must be started in...
Questions
question
Social Studies, 14.07.2019 13:00
Questions on the website: 13722367