subject
Engineering, 22.03.2021 23:00 marisol56

A 8-m thick clay layer at a project site in Pullman, WA is single-drained. 3 years after placement of a surface load on top of this clay, a consolidation settlement of 50 mm was observed. At the end of primary consolidation, the ultimate settlement was 100 mm. If a sample of this soil (that is 30 mm thick), was tested in an oedometer, what would be the expected time required for 50% consolidation

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 08:10
Which of the following is an easy way to remember the modified “x” tire rotation? a. nondrive wheels straight, cross the drive wheels b. drive wheels straight, cross the nondrive wheels c. drive wheels crossed, nondrive wheels straight d. drive wheels crossed, nondrive wheels crossed
Answers: 1
question
Engineering, 04.07.2019 18:10
Water at 70°f and streams enter the mixing chamber at the same mass flow rate, determine the temperature and the quality of the exiting stream. 0 psia is heated in a chamber by mixing it with saturated water vapor at 20 psia. if both streams enters the mixing chamber at the same mass flow rate, determine the temperature and the quality of the existing system.
Answers: 2
question
Engineering, 04.07.2019 19:20
Acircular pipe of 30mm outside diameter is placed in an airstream at 30 c and latm pressure. the air moves in cross flow over the pipe at 20 m/s, while the outer surface of the pipe is maintained at 110 c. what is the drag force exerted on the pipe per unit length? what is the rate of heat transfer from the pipe per unit length?
Answers: 1
question
Engineering, 06.07.2019 02:30
A12 mm diameter shaft runs in a plain cylindrical bush 30 mm long that is located in an 18 mm diameter hole in a housing. the shaft-inner bush fit is h8 f and the outer bush-housing fit is h7-p6. make a fully cimensioned sketch of the bush with tolerances. find the maximum and minimum clearance or interference for both fits on the inner and outer diameters of the bush
Answers: 3
You know the right answer?
A 8-m thick clay layer at a project site in Pullman, WA is single-drained. 3 years after placement o...
Questions
question
History, 18.03.2021 01:50
question
Mathematics, 18.03.2021 01:50
Questions on the website: 13722362