subject
Engineering, 19.03.2021 04:50 reeeeeee32

(10 points) Electric power is to be generated by installing a hydraulic turbinegenerator at a site 70 m below the free surface of a large water reservoir that can supply water steadily at a rate of 1500 kg/s. If the mechanical power output of the turbine is 800 kW and the electric power generation is 750 kW, determine the turbine efficiency (5-point) and the combined turbine-generator efficiency of this plant (5-point). Neglect losses in the pipes.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
question
Engineering, 04.07.2019 18:10
Items are similar to the free issue items, but their access is limited. (clo5) a)-bin stock items free issue b)-bin stock controlled issue c)-critical or insurance spares d)-rebuildable spares e)-consumables
Answers: 1
question
Engineering, 04.07.2019 18:10
Machinery that is a key part of the process and without which the plant or process cannot function is classifed as: (clo4) a)-critical machinery b)-essential machinery c)-general purpose machinery d)-none of the specified options.
Answers: 1
question
Engineering, 04.07.2019 18:20
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
You know the right answer?
(10 points) Electric power is to be generated by installing a hydraulic turbinegenerator at a site 7...
Questions
Questions on the website: 13722367