subject
Engineering, 18.03.2021 01:50 Zaydblackwood06

In order to properly construct this road you have determined that you need to bring in 135,000 CCY of fill material to construct the sub-base. The fill material that is available is dry earth, with a weight of 2800 lbs/BCY and a moisture content of 7%. The percent swell for this soil is 25%. The final compaction level will be 118 PCF dry density and the optimum moisture content is 6%. How many BCY of earth must be excavated to meet this requirement

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The thermal expansion or contraction of a given metal is a function of the f a)-density b)-initial temperature c)- temperature difference d)- linear coefficient of thermal expansion e)- final temperature f)- original length
Answers: 2
question
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
question
Engineering, 04.07.2019 18:10
Awall of 0.5m thickness is to be constructed from a material which has average thermal conductivity of 1.4 w/mk. the wall is to be insulated with a material having an average thermal conductivity of 0.35 w/mk so that heat loss per square meter shall not exceed 1450 w. assume inner wall surface temperature of 1200°c and outer surface temperature of the insulation to be 15°c. calculate the thickness of insulation required.
Answers: 3
question
Engineering, 04.07.2019 19:10
The proportional limit is always greater than the yield strength for a material. a)-trune b)- false
Answers: 3
You know the right answer?
In order to properly construct this road you have determined that you need to bring in 135,000 CCY o...
Questions
Questions on the website: 13722359