If you want to give a vendor an incentive to complete work early which type of contract would you use?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
question
Engineering, 04.07.2019 19:10
With increases in magnification, which of the following occur? a. the field of view decreases. b. the ambient illumination decreases. c. the larger parts can be measured. d. the eyepiece must be raised.
Answers: 1
question
Engineering, 04.07.2019 19:10
A)-explain briefly the importance of standards in engineering design. b)- what is patent? c)-explain the relationship between these standards: b.s. and b.s.en d)- in engineering design concepts, types of loads and how they act are important factors. explain.
Answers: 3
question
Engineering, 04.07.2019 19:10
An engine, weighing 3000 n, is supported on a pedestal mount. it has been observed that the engine induces vibration into the surrounding area through its pedestal at the maximum operating speed. determine the stiffness of the dynamic vibration absorber spring in (n/m) that will reduce the vibration when mounted on the pedestal. the magnitude of the exciting force is 250 n, and the amplitude of motion of the auxiliary mass is to be limited to 2 mm note: in this question type-in right numbers, no decimals, no fractions, no unit. approximate to right number if needed
Answers: 3
You know the right answer?
If you want to give a vendor an incentive to complete work early which type of contract would you us...
Questions
question
Mathematics, 06.11.2019 14:31
question
Mathematics, 06.11.2019 14:31
question
Mathematics, 06.11.2019 14:31
Questions on the website: 13722362