The following data give the drying time T of a certain paint as a function of the amount of a certain additive A.
a. Find the first-, second-, third-, and fourth-degree polynomials that fit the data, and plot each polynomial with the data. Determine the quality of the curve fit for each by computing J, S, and r^2.
b. Use the polynomial giving the best fit to estimate the amount of additive that minimizes the drying time.
A (oz) 0 1 2 3 4 5 6 7 8
T (min) 130 115 110 90 89 89 95 110 125
Answers: 2
Engineering, 04.07.2019 18:10
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed.gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
Engineering, 04.07.2019 19:10
Estimate the change in specific internal energy au and specific enthalpy h from inlet to outlet for ethylene glycol (a liquid) flowing through each of the following devices: (a) a heat exchanger where the glycol temperature increases from 20 °c to 80 °c; (b) a pump operating at about 25 °c and increasing the glycol pressure from 100 kpa to 8 mpa.
Answers: 2
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
The following data give the drying time T of a certain paint as a function of the amount of a certai...
Chemistry, 04.01.2020 04:31
History, 04.01.2020 04:31
Biology, 04.01.2020 04:31
Chemistry, 04.01.2020 04:31
English, 04.01.2020 04:31
English, 04.01.2020 04:31
Biology, 04.01.2020 04:31
English, 04.01.2020 04:31
Business, 04.01.2020 04:31
Mathematics, 04.01.2020 04:31