subject
Engineering, 03.03.2021 20:20 hwk4102

Please help ASAP!! Which type of control system requires engineers to analyze data before any corrective action occurs?

In contrast to automated control systems, a
is a type of control system in which engineers must first analyze a system's output and then decide if the system requires any adjustments.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 19:30
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
question
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
You know the right answer?
Please help ASAP!! Which type of control system requires engineers to analyze data before any corre...
Questions
question
Mathematics, 05.11.2019 00:31
Questions on the website: 13722362