subject
Engineering, 02.03.2021 02:00 wdymRachel4943

Contractor BT MCC has a $10,000,000 financially imposed limit on construction contracts at any one time (imposed by his bank and bonding
agency). He has the opportunity to perform any of the 4 following projects.
Which one(s) should he pursue and why?
• Project A: Commercial, contract size $5,500,000 with a 27%
profit
Project B: Commercial, contract size $3,100,000 with a 30%
profit
Project C: Multi-family Residential, contract size $8,900,000
with a 25% profit
Project D: Industrial, contract size $4,900,000 with a 28% profit
.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
For the closed feedwater heater below, feedwater enters state 3 at a pressure of 2000 psia and temperature of 420 °f at a rate of ix10 ibhr. the feedwat extracted steam enters state 1 at a pressure of 1000 psia and enthalpy of 1500 btu/lbm. the extracted er leaves at an enthalpy of 528.7 btu/lbm steam leaves as a saturated liquid. (16) a) determine the mass flow rate of the extraction steam used to heat the feedwater (10) b) determine the terminal temperature difference of the closed feedwater heater
Answers: 3
question
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
question
Engineering, 04.07.2019 18:10
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
You know the right answer?
Contractor BT MCC has a $10,000,000 financially imposed limit on construction contracts at any one...
Questions
question
Advanced Placement (AP), 23.07.2019 16:20
Questions on the website: 13722362