subject
Engineering, 18.02.2021 21:00 mattmaddox86

You need to calculate the curve number for a site which is composed of: 25 acres industrial buildings, 125 acres 1 acre lots, 60 acres parks/open space with good cover, 40 acres of commercial development, and 225 acres of meadows. The soil was determined to be 50% Sand, 25 % Silt and 25% Clay. a. Determine the Soils Type b. Determine Curve Number for AMC III.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 23:20
Two technicians are discussing the intake air temperature (iat) sensor. technician a says that the computer uses the iat sensor as a backup to the engine coolant temperature (ect) sensor. technician b says that the powertrain control module (pcm) will subtract the calculated amount of fuel if the air measures hot. who is correct
Answers: 3
question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 18:10
Hydraulic fluid with a sg. of 0.78 is flowing through a 1.5 in. i.d. pipe at 58 gal/min. the fluid has an absolute viscosity of 11.8 x 105 lbf-sec/ft2. is the flow laminar, turbulent or within the critical range? give both a numerical reynolds number and a term answer.
Answers: 3
question
Engineering, 04.07.2019 18:10
Which of the following ziegler nichols tuning methods the response of the controller to a step input should exhibit an s-shaped curve? a)-open loop mode b)-closed loop mode c)-both modes (open & closed) d)-none of the modes (open & closed)
Answers: 3
You know the right answer?
You need to calculate the curve number for a site which is composed of: 25 acres industrial building...
Questions
question
Mathematics, 08.07.2019 08:20
question
Mathematics, 08.07.2019 08:20
question
Mathematics, 08.07.2019 08:20
Questions on the website: 13722363