subject
Engineering, 15.02.2021 20:20 Almonte87

The operator of a CNC machine gets paid $60/hour. It takes him 9 mini to load and unload a part (i. e. handling time), and 4 mini to change the cutting tool (which has Taylor coefficients of 0.251 and 900 m/min)|. When he runs the spindle at 900 rpm it finishes a part in 11 mini. His cutting tool costs him $95 each and he is able to machine 80 parts| before having to replace the tool. He wants to know if he can save money by running the spindle at 1400 rpm. What is the cost per part at 900 rpm and at 1400 rpm? C = vT^n rightarrow T_2/T_1 = (C/v_2)^1/n/(C/v_1)^1/n = (v_1/v_2)^1/n

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Apump is used to circulate hot water in a home heating system. water enters the well-insulated pump operating at steady state at a rate of 0.42 gal/min. the inlet pressure and temperature are 14.7 lbf/in.2, and 180°f, respectively; at the exit the pressure is 60 lbf/in.2 the pump requires 1/15 hp of power input. water can be modeled as an incompressible substance with constant density of 60.58 lb/ft3 and constant specific heat of 1 btu/lb or. neglecting kinetic and potential energy effects, determine the temperature change, in °r, as the water flows through the pump.
Answers: 1
question
Engineering, 04.07.2019 18:20
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
question
Engineering, 04.07.2019 18:20
Apiston-cylinder device contains 0.1 m3 of liquid water and 0.9 m3 of water vapor in equilibrium at 800 kpa. heat is transferred at constant pressure until the temperature of water reaches 350 °c. determine (a) the quality of water at the initial state (b) the work associated with this process, (c) the heat associated with this process.
Answers: 2
question
Engineering, 04.07.2019 19:20
List 3 options on how to reduce knocking problens during engine process,
Answers: 2
You know the right answer?
The operator of a CNC machine gets paid $60/hour. It takes him 9 mini to load and unload a part (i....
Questions
Questions on the website: 13722363