Engineering, 09.02.2021 05:00 francisco42002

When preparing to begin a earth moving project that will require at least 2 years of site preparations and million tons of material has to be relocated and some blasting from solid rock
will be a part of the process. I have given you several steps that are required before and during
the process. Put them in order and give a short description of what work and preparation will
need to be completed in each step.
1. You will need to acquired the property and mineral rights or have a contract to perform
all said work described in the contract. Write down some considerations that are a must
happen before entering the property with a piece of equipment.
Call the wife and make plans for supper.
Call 811
Call the power company
Call an engineering firm.
Get in touch with the local fire department.
Get in touch with the highway department.
Get in touch with the county road department.
Check the weight limits on any bridges that have to be crossed with equipment our
trucks hauling materials.
Get in touch with the local hardware and set up an account.
Find an equipment dealership to purchase parts when needed to repair equipment.
Get in touch with the local unemployment office to set up a hiring event.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:20
What is the heat treatment of metals? what is the benefit of it? why and how it's useful? answer in details, do not write by hand.
Answers: 3
question
Engineering, 05.07.2019 10:10
What is the correct way to measure the overall length of a boat? measure from the tip of the bow to the highest point on the gunwale. measure from the tip of the bow in a straight line to the stern of the boat. measure from the tip of the bow in a straight line to the back seat. measure from port to starboard at the boat's widest point.
Answers: 1
You know the right answer?
When preparing to begin a earth moving project that will require at least 2 years of site preparati...
Questions
question
Mathematics, 28.05.2020 00:59
Questions on the website: 13722363