Bonus (15pts)A traffic signal has a 60-second cycle length. For the travel direction of interest, the effective red and green times are 30 seconds each, the arrival rate is constant (i. e. no random fluctuations) at 20 vehs/min and the saturation flow (i. e., the queue discharge rate) is 1 veh/sec. a)Calculate the average delay for the travel direction of interest. b)Assume work on the street is taking place downstream of the intersection so that only 25 vehs/min (in the direction of interest) can pass. Calculate the average delay caused by the street work to a vehicle leaving the intersection. Assume that the queue atthe downstream restriction never backs-up into the intersection.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The thermal expansion or contraction of a given metal is a function of the f a)-density b)-initial temperature c)- temperature difference d)- linear coefficient of thermal expansion e)- final temperature f)- original length
Answers: 2
question
Engineering, 04.07.2019 18:10
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
question
Engineering, 04.07.2019 18:20
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
question
Engineering, 04.07.2019 19:10
What is the major difference between thermoplastics and thermosetting plastics from the polymerization structure point of view?
Answers: 2
You know the right answer?
Bonus (15pts)A traffic signal has a 60-second cycle length. For the travel direction of interest, th...
Questions
question
Mathematics, 29.04.2021 01:50
question
Mathematics, 29.04.2021 01:50
question
Mathematics, 29.04.2021 01:50
question
Mathematics, 29.04.2021 01:50
Questions on the website: 13722360