Reducing exposure to a risk is part of which component of risk mitigation?
A.
Tolerate
...
Engineering, 11.01.2021 22:30 nehakarakkattu
Reducing exposure to a risk is part of which component of risk mitigation?
A.
Tolerate
B.
Transfer
C.
Terminate
D.
Treat
Answers: 1
Engineering, 04.07.2019 18:10
Water at the rate of 1 kg/s is forced through a tube with a 2.5 cm inner diameter. the inlet water temperature is 15°c, and the outlet water temperature is 50°c. the tube wall temperature is 14°c higher than the local water temperature all along the length of the tube. what is the length of the tube?
Answers: 3
Engineering, 04.07.2019 18:20
The characteristic roots of a dynamic system are: 1.7920 1.8160 i, -1.7920 1.8160 i, -0.4160 what is the order of this system? what are the settling time and damping ratio of the system?
Answers: 3
Engineering, 04.07.2019 19:10
The maximum shear stress and maximum flexural stress occur at the same location along a beam subjected to a non-uniform bending load. a)-trune b)- false
Answers: 2
Engineering, 04.07.2019 19:10
Arigid tank contains 10 kg of air at 137 kpa (abs) and 21°c. more air is added to the tank until the pressure and temperature rise to 242 kpa (abs) and 32°c, respectively. determine the amount of air added to the tank. [r-0.287 kj/kg k]
Answers: 3
Mathematics, 08.12.2019 01:31
Biology, 08.12.2019 01:31
Biology, 08.12.2019 01:31
Chemistry, 08.12.2019 01:31
Health, 08.12.2019 01:31
English, 08.12.2019 01:31
Biology, 08.12.2019 01:31