subject
Engineering, 11.01.2021 14:00 itscheesycheedar

Ten customers visit Candy Haven Bakery from 8am to 10 am. The customers spend 10, 15, 20, 11, 8, 12, 5, 18, 29, and 32 minutes in the bakery. What is the average flow rate of customers in this bakery per hour?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 04.07.2019 16:10
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:10
Water at 70°f and streams enter the mixing chamber at the same mass flow rate, determine the temperature and the quality of the exiting stream. 0 psia is heated in a chamber by mixing it with saturated water vapor at 20 psia. if both streams enters the mixing chamber at the same mass flow rate, determine the temperature and the quality of the existing system.
Answers: 2
You know the right answer?
Ten customers visit Candy Haven Bakery from 8am to 10 am. The customers spend 10, 15, 20, 11, 8, 12,...
Questions
question
Advanced Placement (AP), 24.05.2020 21:57
question
Mathematics, 24.05.2020 21:57
question
Mathematics, 24.05.2020 21:58
question
History, 24.05.2020 21:58
Questions on the website: 13722367