Engineering, 31.12.2020 05:30 ohhrs
Technician A says that to depressurize high-pressure components of the electronic brake control (EBC) system, research the procedure for depressurizing the accumulator in the service information. Technician B says to remove the ABS fuse from the fuse box and apply the brake firmly at least 40 times when depressurizing the components of the EBC system. Who is correct
Answers: 3
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
Engineering, 04.07.2019 18:10
For the closed feedwater heater below, feedwater enters state 3 at a pressure of 2000 psia and temperature of 420 °f at a rate of ix10 ibhr. the feedwat extracted steam enters state 1 at a pressure of 1000 psia and enthalpy of 1500 btu/lbm. the extracted er leaves at an enthalpy of 528.7 btu/lbm steam leaves as a saturated liquid. (16) a) determine the mass flow rate of the extraction steam used to heat the feedwater (10) b) determine the terminal temperature difference of the closed feedwater heater
Answers: 3
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
Technician A says that to depressurize high-pressure components of the electronic brake control (EBC...
History, 25.09.2019 03:30
English, 25.09.2019 03:30
Physics, 25.09.2019 03:30
Mathematics, 25.09.2019 03:30
History, 25.09.2019 03:30
Mathematics, 25.09.2019 03:30
History, 25.09.2019 03:30
Mathematics, 25.09.2019 03:30
Mathematics, 25.09.2019 03:30
Mathematics, 25.09.2019 03:30
History, 25.09.2019 03:30
History, 25.09.2019 03:30