subject
Engineering, 17.12.2020 22:10 mochoa4

Engineering Design I Worksheet Part One: Defining the Problem and Sub-Problems
Choose one of the real-world problems about natural resources to research. Explain which one you chose here.

Research this problem to learn more about it. Use the research tools given in the lesson if you need help.

After you have researched the problem, explain in your own words who the problem impacts and why it is important.

List two sub-problems that are part of the bigger problem but are more manageable and solvable.

Explain how these sub-problems are related to or a direct result of the overall problem.

Part Two: Criteria, Constraints, and Prioritizations
Choose one sub-problem that you will investigate further and explain which one you chose here.

List two realistic criteria for the sub-problem.

Explain why it is important for these criteria to be met in order to solve the problem.

List two constraints for the sub-problem.

Explain why these constraints exist. (How do they limit solutions to the problem?)

Prioritization of the criteria and constraints and an explanation supporting the decisions made based on research.

Ranking Criteria or Constraint Reason for Prioritization
1
2
3
4
Part Three: Generate Solutions
List two solutions that you have generated for the chosen sub-problem.

Describe how the sub-problem can be solved, and include the research supporting each solution.

Explain how prioritization was involved in designing each solution.

Explain how both solutions to the sub-problem play a role in solving the larger problem.

List of the sources (at least three) you used for research, following the MLA style guide.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit.explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
question
Engineering, 04.07.2019 18:20
Select any two (2) areas of applications of chain-drive. (clo4) a)-permanent lubrication necessary b)-hydraulic forklift truck operation c)-rigging and heavy moving materials d)-relatively high maintenance costs e)-costlier than belt drives
Answers: 2
question
Engineering, 04.07.2019 18:20
Determine the damped natural frequencies and the steady state response of a decoupled damped forced two degrees of freedom system. 10ä1 + 2q1 20q1 10 cos t; 10q2 +4q2 + 40q2 10 cos t
Answers: 3
You know the right answer?
Engineering Design I Worksheet Part One: Defining the Problem and Sub-Problems
Choose one of...
Questions
question
Mathematics, 01.10.2019 14:30
question
History, 01.10.2019 14:30
question
History, 01.10.2019 14:30
Questions on the website: 13722363