Engineering, 01.12.2020 22:20 carlydays4403
Question* Once we have have completed the excavation , constructed forms for our footing and properly installed the rebar , what is the next step in the construction ? NEED HELP ASAP
Answers: 1
Engineering, 03.07.2019 14:10
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
Engineering, 04.07.2019 08:10
Which of the following is an easy way to remember the modified “x” tire rotation? a. nondrive wheels straight, cross the drive wheels b. drive wheels straight, cross the nondrive wheels c. drive wheels crossed, nondrive wheels straight d. drive wheels crossed, nondrive wheels crossed
Answers: 1
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
Question* Once we have have completed the excavation , constructed forms for our footing and properl...
Biology, 04.07.2019 03:00
Social Studies, 04.07.2019 03:00
History, 04.07.2019 03:00
Biology, 04.07.2019 03:00
History, 04.07.2019 03:00
Computers and Technology, 04.07.2019 03:00
Biology, 04.07.2019 03:00
Computers and Technology, 04.07.2019 03:00
Mathematics, 04.07.2019 03:00
Mathematics, 04.07.2019 03:00