subject
Engineering, 01.12.2020 01:00 Gearyjames8

Select the correct answer from each drop-down menu. James is a building contractor and needs to decide at what depth he should lay the foundation. What information will he require?
James would have to determine the ( materials to be used, number of workers available, load bearing capacity of the soil)
and the (design of the building, availability of machines, amount to be spent)
to decide at what depth he should lay the foundation.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:10
Aflywheel accelerates for 5 seconds at 2 rad/s2 from a speed of 20 rpm. determine the total number of revolutions of the flywheel during the period of its acceleration. a.5.65 b.8.43 c. 723 d.6.86
Answers: 2
question
Engineering, 04.07.2019 18:10
Items are similar to the free issue items, but their access is limited. (clo5) a)-bin stock items free issue b)-bin stock controlled issue c)-critical or insurance spares d)-rebuildable spares e)-consumables
Answers: 1
You know the right answer?
Select the correct answer from each drop-down menu. James is a building contractor and needs to dec...
Questions
question
Mathematics, 24.06.2020 22:01
Questions on the website: 13722360