Engineering, 30.11.2020 19:10 987654321156
In which phase and for what purpose does a construction manager work with various consultants? In the [blank] phase, a construction manager works closely with architects, civil engineers, electrical engineers, and other consultants to prepare a [blank].
Choices for first [blank]
A. design and planning
B. Construction
C. Post construction
Choices for second [blank]
A. draft
B. Sketch
C. Blueprint
Answers: 1
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
Engineering, 04.07.2019 18:20
Amixture of slurry and mud is to be pumped through a horizontal pipe of diameter 500 mm. the fluid behaves as a bingham plastic with a yield stress of 30 pa and viscosity 0.04 pa.s. describe the effects of the shear stress through a transverse section of the pipe by plotting the variation in shear stress and velocity profile: (i) just before the slurry starts to move (ii) as the slurry flows when the pressure gradient is double that in part (i)
Answers: 3
Engineering, 04.07.2019 19:10
Asteam is contained in a rigid tank with a volume of 1 m3. initially, the pressure and temperature are 7 bar and 500 oc, respectively. the temperature drops due to cooling process. determine: (1) the temperature at which condensation begins in °c, (2) the fraction of the total mass that has condensed when the pressure decreased to 0.5 bar. (3) the volume in m3 occupied by saturated liquid at the final state?
Answers: 3
In which phase and for what purpose does a construction manager work with various consultants? In th...
Mathematics, 31.03.2021 14:00
Geography, 31.03.2021 14:00
Mathematics, 31.03.2021 14:00
Mathematics, 31.03.2021 14:00
Mathematics, 31.03.2021 14:00
Mathematics, 31.03.2021 14:00
Mathematics, 31.03.2021 14:00
Social Studies, 31.03.2021 14:00
History, 31.03.2021 14:00
Mathematics, 31.03.2021 14:00